Dump Truck, Trailer

Tandem Dump Truck, Trailer

Equipment

Skid Steer, Excavator, Asphalt Paver, Roller, Motor Grader, Dozer

Site Work Tools

Walk Behind Saw, Hand Saw, Jumping Jack, Plat Compactor

GIS As Built Submittals

Forsyth - SR 369 Over Settingdown Creek, Gwinnett - SR 120 Over Singleton Creek, Madison - SR 281 Bridge, Madison US29 Bridge, SR 59 Over Hudson River

CAD/PDF as Built Submittals

Campbell heights, Merganser Commons Publix 1873 and Retails, Rakestraw

Construction Stakeout for Residential Construction

Ann Arbor, Peachtree Dunwoody, Brookwood Parke - Lot Corner Stakeout

Permit Plans for Watermill Express, Colorado

Auroa, Evans, Westminister, Greely, Fort Morgan, Longmont

Merlendale Sewer Extension

Milling and Asphalt Paving, Traffic Control

Dunkin Parking Lot, LaGrange

Parking Lot Cleaning, Trenching, Concrete Filling, Crack Sealing, Asphalt Resurfacing, Striping

Construction Stakeout for Roadway Projects

Town Center Roadway Imps, Downtown Improvement City of Smyrna, Church Road Sidewalk, Campus Loop Road, Riverside Parkway, 853 Gaston, Lawrenceville Slip Ramp at SR 316 and SR 120 (Duluth Hwy), Jim Owens Road, West Midland Avenue, Almand Branch Sewer, Kimball Street Sewer, SR 124 @ Jackson Street, Davis Road Sidewalk, Shaw Road Sidewalk, Forest Park, Washington Rd Intersection, North Decatur Road, Aztec Road Sidewalk, Destination Park Sidewalk, Oakmont Braselton, Tributary Retail, SR 124 @ Jackson St - Stakeout, Davenport Rd ext@ SR 13 Buford Hwy, Gilbert Road

House Location Plans Preparation

Brookwood Parke Ph II- Jacob Hayut, Highlands at Flat Shoals Project, Harmony Phase I, Spout Springs Road, 1124 Northwest Drive Atlanta, 1042 Hightower Revise to Maple 2 Drawing, 2046 Lois Place; Revise to Maple 2, 2850 Peek Road Full Site Plan, 156 and 158 Hemphill Site Plans, 1965 Lois Place, 1218 First Street, 2415 Saint Paul, Harmony Phase I HLP (Lots 3, 4, 37), 7145 Crestline Drive, 1812 West Nancy Creek Drive, 6828 Silver Maple Drive, 1230 Second Street, 0 Church Street, 844 Ridge Ave, 877 Oak Street

This is a sample page.

Overview

Our refund and returns policy lasts 30 days. If 30 days have passed since your purchase, we can’t offer you a full refund or exchange.

To be eligible for a return, your item must be unused and in the same condition that you received it. It must also be in the original packaging.

Several types of goods are exempt from being returned. Perishable goods such as food, flowers, newspapers or magazines cannot be returned. We also do not accept products that are intimate or sanitary goods, hazardous materials, or flammable liquids or gases.

Additional non-returnable items:

  • Gift cards
  • Downloadable software products
  • Some health and personal care items

To complete your return, we require a receipt or proof of purchase.

Please do not send your purchase back to the manufacturer.

There are certain situations where only partial refunds are granted:

  • Book with obvious signs of use
  • CD, DVD, VHS tape, software, video game, cassette tape, or vinyl record that has been opened.
  • Any item not in its original condition, is damaged or missing parts for reasons not due to our error.
  • Any item that is returned more than 30 days after delivery

Refunds

Once your return is received and inspected, we will send you an email to notify you that we have received your returned item. We will also notify you of the approval or rejection of your refund.

If you are approved, then your refund will be processed, and a credit will automatically be applied to your credit card or original method of payment, within a certain amount of days.

Late or missing refunds

If you haven’t received a refund yet, first check your bank account again.

Then contact your credit card company, it may take some time before your refund is officially posted.

Next contact your bank. There is often some processing time before a refund is posted.

If you’ve done all of this and you still have not received your refund yet, please contact us at {email address}.

Sale items

Only regular priced items may be refunded. Sale items cannot be refunded.

Exchanges

We only replace items if they are defective or damaged. If you need to exchange it for the same item, send us an email at {email address} and send your item to: {physical address}.

Gifts

If the item was marked as a gift when purchased and shipped directly to you, you’ll receive a gift credit for the value of your return. Once the returned item is received, a gift certificate will be mailed to you.

If the item wasn’t marked as a gift when purchased, or the gift giver had the order shipped to themselves to give to you later, we will send a refund to the gift giver and they will find out about your return.

Shipping returns

To return your product, you should mail your product to: {physical address}.

You will be responsible for paying for your own shipping costs for returning your item. Shipping costs are non-refundable. If you receive a refund, the cost of return shipping will be deducted from your refund.

Depending on where you live, the time it may take for your exchanged product to reach you may vary.

If you are returning more expensive items, you may consider using a trackable shipping service or purchasing shipping insurance. We don’t guarantee that we will receive your returned item.

Need help?

Contact us at {email} for questions related to refunds and returns.

Water Utility

Service Line of Copper and PE Tubing, Fire Hydrant Installation and Replacement, Fire Line Installation.

Sewer Utility

Sewer Pipe Installation, Manhole, Vacuum testing, Air Testing, Camera Testing.

Concrete paving work

Concrete Paving

Footing/Foundations, Retaining Wall, Slab, Sidewalk, Curb, Driveway, Pavement, Stamped/Color Concrete.
Brick & Block masonry work

Brick, Block & Stone Masonry

Dumpster Block Wall, Brick Veneer, Stone Wall, Ashlar Masonry, Granite Marble Wall and Veneer.
Brick pavers installation work

Brick & Stone Pavers

Brick & Stone Paver Installation, Paver Cleaning, Repair & Restoration, Hardscape, Pool Decking.​
3 points level survey

3 Points Level From Survey

3 Points Calculations for Roadway to Verify Asphalt Levelling Quantity
ALTA survey

Existing ALTA Survey

Boundary survey, Topographic survey, Construction survey, Subdivision Survey, Land Title survey.
Grade calculation

Grade Calculation - Roadway

Preparation of Excel Sheet to Shoot Grade in Field Directly From Benchmark.
commercial construction project management

Project Management

Commercial and Roadway Construction Project Management, Cost and Expense Tracking, Material and Manpower Scheduling, Value Engineering
Preconstruction estimation

Pre Construction

Find out Sub Contractors, Material Procurement, Contract, Negotiations
Takeoff estimation

Estimation & Takeoff

Detailed Estimation and Takeoff for Earthwork, Trucking, Concrete, Asphalt, Striping, Storm, Sewer, Water and Underground Pond, Landscape, Hardscape, Pavers, Walls, Culvert, Erosion Control.